{"id":7371,"date":"2024-06-08T13:37:27","date_gmt":"2024-06-08T03:37:27","guid":{"rendered":"https:\/\/delburnwindfarm.au\/?p=7371"},"modified":"2024-06-08T13:41:05","modified_gmt":"2024-06-08T03:41:05","slug":"delburn-wind-farm-update-duplicate-7339","status":"publish","type":"post","link":"https:\/\/delburnwindfarm.au\/prod\/delburn-wind-farm-update-duplicate-7339\/","title":{"rendered":"Delburn Wind Farm Update"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"7371\" class=\"elementor elementor-7371\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-7599246e elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"7599246e\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-43c88b85\" data-id=\"43c88b85\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-62a496d4 elementor-widget elementor-widget-text-editor\" data-id=\"62a496d4\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><em><strong>Attributable to Peter Marriott, Executive Director Development, OSMI Australia:<\/strong><\/em><\/p><p>\u201cRegional Roads Victoria are installing the overtaking lane along Strzelecki Highway and Creamery Road. These works are not part of the Delburn Wind Farm construction.<\/p><p>\u201cThe Victorian Government allocated budget several years ago for the works to improve traffic flow and safety.<\/p><p>\u201cThe road upgrade has not been commissioned by the Delburn Wind Farm and is of no benefit to the project. The majority of wind turbine components will go to the north of the site, with no need to use the new overtaking lane.<\/p><p>\u201cAs part of a preliminary traffic assessment, a planning application was submitted to upgrade the corner of Creamery Road, however VicRoads already had plans to do this work.<\/p><p>\u2018\u2019The development and design of the Delburn Wind Farm has focussed on reducing the impacts to local flora and fauna and minimising the clearing of vegetation.\u201d<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>\u201cRegional Roads Victoria are installing the overtaking lane along Strzelecki Highway and Creamery Road. These works are not part of the Delburn Wind Farm construction.<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wds_primary_category":0,"footnotes":""},"categories":[17],"tags":[],"class_list":["post-7371","post","type-post","status-publish","format-standard","hentry","category-media-release"],"_links":{"self":[{"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/posts\/7371","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/comments?post=7371"}],"version-history":[{"count":0,"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/posts\/7371\/revisions"}],"wp:attachment":[{"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/media?parent=7371"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/categories?post=7371"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/delburnwindfarm.au\/prod\/wp-json\/wp\/v2\/tags?post=7371"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}